OUR SOLUTION
Commodity Centre designed and fitted-out a 60,000 sq ft tailored facility dedicated to the handling and storage of coffee. Through the use of new racking systems and narrow aisle forklift trucks, a storage capacity significantly greater than Costa’s previous solution was achieved. Not only this but the quality of storage was far exceeded.
This facility included a customised loading-in and loading-out segregated area that housed state-of-the-art, tailor-made unloading and reloading machinery.
Commodity Centre suggested using a bulk shipping solution, replacing the smaller jute bags, to increase maximum product capacity placed in the shipping container from 19.2 to 21.6 metric tonnes. This initiative gave a 12.5 % reduction in required shipping containers; reduced costs; and reduced carbon emissions and energy usage.
These containers are then sent directly to Commodity Centre’s warehouse where they are decanted into reusable bulk bags and then stored in racked warehousing. When called down for delivery the bags are then decanted using custom-made, unloading machinery, then placed into a silo truck for delivery.
Our solution to Costa Coffee encompassed two main areas:
- To design and build a bespoke warehouse facility to complement the Costa investment in their state of-the-art roastery.
- To reduce manual handling or excessive logistic requirements in Costa’s operations.
BENEFITS TO COSTA COFFEE:
Following Costa’s initial requirement in 2016, we have agreed a new long-term contract to continue the collaborative working relationship; providing the most efficient and sustainable supply chains.
- 12.5% reduction in shipping costs.
- A bespoke and dedicated terminal.
- Zero manual handling at customer’s premises.
- Significant reduction in manual handling across the whole supply chain.
- 15% increase in raw coffee beans placed onto truck for delivery to the roastery.
- Electric powered forklifts.
- Reduction in costs, carbon usage & energy usage.
- Entire terminal powered by solar energy